Topplokk
Demontering av topplokk, ventiler, pakninger og moment.
3 prosedyrer
Cylinder Head and Head Gasket Installation
Procedure for installing the cylinder head and head gasket on 8V 944/924S/924 engines, including gasket selection, head stud torquing sequence, exhaust manifold installation, and coolant refill.
PDF944 · 944 Turbo · 924S
Cylinder Head and Head Gasket Removal — 8V Engines
Procedure for removing the cylinder head and head gasket from the 8V 944/924S/924 engine, including camshaft assembly, intake manifold, exhaust manifolds, and head stud removal.
PDF944 · 944 Turbo · 924S
Cylinder Head Tightening Sequence and Torque Specifications
Head stud torque specifications and tightening sequence for all 8V and 16V 944/924S/968 engines, with the stud tightening diagram and instructions for angle-tightened assemblies.
PDF944 · 944S · 944S2